A Path Of Growth

Main Projects

In our 15 years of business, we have successfully and to the satisfaction of our customers completed various activities all over the world. 

Our ability to develop in international markets has been rewarded by a continuously growing trend.  The decisive presence in certain markets characterised by great complexity testifies to our ability to strive for excellence in methods, means and objectives.  

Below is a non-exhaustive list of completed projects:

​2007 Caracas – Cua (Venezuela) Railway line construction of the railway in cooperation with Astaldi.
2008 - Tramway in Bergamo ​Cooperation in track construction of 30 km
2009 Etimesgut-Sincan (Turkey) Cooperation in track construction for the 30 km high - speed line and track measurement with GEDO CE – system.
2010 Edirne (Turkey) Cooperation in track renewal and tamping works on the 60 km the railway line and track measurement with the GEDO CE – system.
2011 Bari Airport Palese (Italy) Cooperation in track construction of 15 km new railway and track survey with GEDO CE – system.
2012 Sincan-Ankara (Turkey) Collaboration with the company GCF Türkiye in the construction of the high speed line
2012 Ankara (Turkey) Tamping service, profiling in the construction of the new underground in Ankara
2013 Istanbul (Turkey) ​Collaboration with GCF Türkiye for the construction of 60 km of new railway line.
2016/2017 Akko-Karmiel (Israel) ​Construction of new railway line in Israel with Bahnbau Gruppe GmbH.
2022 Consolidation works in the Serre La Voute - Val di Susa railway tunnel Baraldini Quirino Costruzioni Ferroviarie Spa
2024 . Systematic track levelling on the section Corato-Bari with Ferrotramviaria Spa
2019/2020 (Croatia) Dugo Selo-Krizevci ​Tamping and ballast regulating service for a new railway line on behalf of with Div Grupa Doo
2023 - Systematic track and tournouts levelling (32 kms) in Bari-Ruvo section - Ferrotramviaria Spa in cooperation with Ing. De Aloe Costruzioni Srl
2020 ​Technical partnership with Comsa SA - Mexico City
2023 - Consolidation works in a railway tunnel Serre La Voute (Turin) - Baraldini Quirino Costruzioni Ferroviarie Spa
2022 Systematic track levelling railway line Archi-Bomba (CH) - Italy on behalf of TUA SpA (Trasporto Unico Abruzzese Spa)
2023 - Systematic track levelling San Vito-Lanciano (CH) -ITALY - Trasporto Unico Abruzzese Spa

Gallery

RECAPITI

ELLECOSTA SRL

The company ELLECOSTA SRL is a limited liability company registered at the Chamber of Commerce, Industry and Handicraft of the Autonomous Province of Bolzano with registration number REA BZ-211964, registered on 15/01/2015 with fully paid-up share capital.

Registered office address: Via Costa 1, 39030 La Valle

VAT no.: 02863250219

PEC address: otto.ellecosta@pec.it